Review from the Homeowner - Taken from Redoux's Google Page

This project originated due to a foundation issue. The foundation contractors left the guest bathroom operable but cosmetically unappealing. Due to budget restraints, we will be re-purposing the existing toilet and shower doors. The vanity, sink, fixtures, flooring, shower tile and shower floor will be new. Watch for updates as this guest bathroom is transformed from blah to gorgeous.

 

This project is a small guest bathroom. When we first met with homeowners, there was evidence of foundation issues which they had repaired. The contractors left the bathroom in an unusable state, especially for children. As part of this project, the homeowners wanted to remove the popcorn ceiling, repair the drywall behind the toilet which had visible damage, replace the vanity, install a new quartz counter top, new tile flooring, new shower wall tile as well as new shower floor tile, which was a fun grey/beige pebble stone. The primary color was grey with beige accents, and the pebble shower floor brought all the colors together.

 

To stay on budget, we reused the existing shower doors (just needed to clean them up), and the existing toilet. The project took six days from start to finish with no corners cut and the job done right! 

Insured & General Contractor License #AEC7352

GET in

TOUCH

  • blog-icon
  • facebook-icon
  • youtube-icon
  • pinterest-icon
  • houzz-icon
thumbtack-logo.jpg

All Rights Reserved | Copyright The Redoux 2020